BUSCADOR
  Portada | Clasificados | Foros | Ediciones anteriores | Archivo | Suscripciones | Portadas PDF | Titulares por e-mail | Contáctenos
Panamá, viernes 23 de mayo de 2008
 

BRIEFS. energy

Reservoirs drained in early months of 2008

Gabriel Rodríguez/ La Prensa
No Rain: There was no precipitation in Bayano yesterday and the lake level fell from 53.76 meters to 53.64 meters above sea level. 1029422

The Centro Nacional de Despacho (CND), which oversees the operation and management of the energy market, increased the delivery of hyrdroelectric energy during the first months of the year. That contributed significantly to decreasing the level of the country's reservoirs when water resources ought to have been conserved, said the manager of AES Panamá, Javier Giorgio. AES is the largest electricity generation company in Panama.

CND reports indicate that 70 percent of the energy dispatched in January was generated by hydroelectric plants.

The manager of Empresa de Transmisión Eléctrica Eléctrica, Isaac Castillo, said the CND uses whatever energy is available at the moment and that it's possible that there were various thermal generators undergoing repairs in January.

After the recent rain, Lago Fortuna rose almost two meters to 1,013 meters above sea level, preventing the need to ration electricity in the upcoming days.

© 2008. Corporación La Prensa. Derechos reservados.
 
 
 
© 2008. Corporación La Prensa. Derechos reservados.
Advertencia: Todo el contenido de www.prensa.com pertenece a Corporación La Prensa S.A. Razón por la cual, el material publicado no se puede reproducir, copiar o transmitir sin previa autorización por escrito de Corporación La Prensa S.A.
Le agradecemos su cooperación y sugerencias a internet@prensa.com y Servicio al Cliente.
En caso de necesitar mayor información accese a nuestra biblioteca digital o llámenos al 222-1222.
Corporación La Prensa: (507)222-1222
Apartado 0819-05620 El Dorado Ave. 12 de octubre, Hato Pintado Panamá, República de Panamá